Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 8:00 AM – 5:00 PM · 954-807-3208
Romco CommercialCall

Areas served · Miami-Dade County

Commercial Build-Outs in Coral Gables

About 45 minutes from our Fort Lauderdale base. In Coral Gables the Board of Architects reviews exterior changes, and the Mediterranean design standards that shaped Miracle Mile still decide what a storefront may look like before the interior has even been priced.

Send a floor plan, a lease exhibit, or a landlord work letter. We come back with a real number and the assumptions behind it.

67

Florida counties Romco Builders is licensed to build in.

3

Home counties on this desk: Miami-Dade, Broward and Palm Beach.

4

Principals run the firm. There is no account-manager layer between you and them.

Self-perform

Dewatering, support of excavation and deep foundations we do with our own people.

Corridors and districts

Where the work is in Coral Gables

Miracle MilePonce de Leon BoulevardAlhambra CircleShops at Merrick Park
  • Miracle Mile storefront and restaurant renovations
  • Office suite fit-outs in the Ponce de Leon towers
  • Exterior and signage packages taken through Board of Architects review

What we are building in

The commercial stock in Coral Gables

Ponce de Leon Boulevard carries the office towers, Miracle Mile the small-bay retail and restaurant frontage. Much of it sits in buildings shaped by the city’s original Mediterranean design programme, which is still the governing aesthetic.

The authority having jurisdiction

Permitting and review here

The Coral Gables Board of Architects reviews exterior changes. This is the most important scheduling fact about building here: a storefront, an awning, a sign or even a paint colour is an approval with a meeting calendar attached, and it runs in parallel with — not inside — the building permit.

What the ground and the structure do

Site and building conditions in Coral Gables

Interiors here are conventional. Exteriors are not. We price Coral Gables work with the exterior scope carrying its own approval duration, and we do not release storefront or sign materials for fabrication until the Board has actually acted. Ordering early to save time is how money gets lost in this city.

Logistics

Access, loading and working hours

Miracle Mile has metered street loading and constant pedestrian traffic. The Ponce towers have docks and freight elevators on scheduled windows. Both push demolition and heavy deliveries into early morning.

The case

Why owners in Coral Gables call us

We build in buildings that are still open

Most commercial work here is not an empty shell. It is a floor above a working tenant, a suite next to a trading desk, or a dining room that has to serve on Friday. We phase, we work the hours the landlord allows, and we protect the path from the dock to your door.

A budget before you sign the lease

Send us the space and the landlord work letter before the LOI is final. We will price the build-out and name the assumptions, so you negotiate the tenant improvement allowance knowing the real number instead of finding it after you are committed.

Self-perform site engineering

Dewatering, support of excavation and deep foundations — including tidal sites — are done by our own crews, not brokered out. Very few Florida general contractors can say that. When a build-out turns into a structural or below-grade problem, it does not become somebody else’s schedule.

An institutional record behind the field team

Our leadership has delivered Hospital for Special Surgery’s FDR expansion, Emigrant Savings Bank fit-outs, the ADL tenant renovation in New York, and deep foundations at 1515 Surf Avenue. That is leadership experience, not a Romco Builders project list — and we will always say which is which.

FAQ

Questions from Coral Gables

Do you take commercial work in Coral Gables?
Yes. About 45 minutes from our Fort Lauderdale base. The Coral Gables Board of Architects reviews exterior changes. This is the most important scheduling fact about building here: a storefront, an awning, a sign or even a paint colour is an approval with a meeting calendar attached, and it runs in parallel with — not inside — the building permit.
How long does Board of Architects review take?
It runs on a meeting calendar, so the honest answer is that it depends on when you submit and whether the board asks for changes. What we can control is starting it immediately and not committing to fabrication until it is approved. We show it as its own milestone on the schedule.
Can we start the interior while the exterior is in review?
Usually yes, and that is the right way to sequence it. Interior permitting and construction proceed while the exterior package works through the Board. The risk to manage is ordering the storefront early — we do not.
Do you charge to look at a space and give us a number?
No. A walk-through and an order-of-magnitude budget on a Coral Gables space you are considering costs you nothing — that conversation should not have an invoice attached. A full preconstruction engagement, with a line-item budget, a constructability log and a permitting map, is a priced scope of work, and we credit the fee against the construction contract if you build with us.
Can you work around the hours our business actually operates?
Yes, and in Coral Gables it is usually the only way the job gets done. Phased construction, off-hours demolition, temporary partitions and a maintained path of egress are normal parts of our scope. Off-hours premiums are shown as their own line so you can see exactly what the phasing costs.

Nearby markets we also build in

Next step

Building in Coral Gables.

Send a floor plan, a lease exhibit, or a landlord work letter. We come back with a real number and the assumptions behind it.