Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 8:00 AM – 5:00 PM · 954-807-3208
Romco CommercialCall

Areas served · Palm Beach County

Commercial Build-Outs in Delray Beach

About 35 minutes from our Fort Lauderdale base. Atlantic Avenue’s restaurant density is effectively the Delray Beach commercial market, and a kitchen build-out inside the Old School Square historic district has to satisfy a preservation review as well as a health inspection.

Send a floor plan, a lease exhibit, or a landlord work letter. We come back with a real number and the assumptions behind it.

67

Florida counties Romco Builders is licensed to build in.

3

Home counties on this desk: Miami-Dade, Broward and Palm Beach.

4

Principals run the firm. There is no account-manager layer between you and them.

Self-perform

Dewatering, support of excavation and deep foundations we do with our own people.

Corridors and districts

Where the work is in Delray Beach

Atlantic AvenuePineapple GroveOld School Square historic districtCongress Avenue
  • Restaurant and bar build-outs on Atlantic Avenue
  • Historic district renovations around Old School Square
  • Office and light industrial fit-outs on the Congress Avenue belt

What we are building in

The commercial stock in Delray Beach

Atlantic Avenue is the market: two-storey pre-war and mid-century commercial buildings running at very high restaurant and bar density, with Pineapple Grove behind it and a light industrial and office belt out on Congress Avenue.

The authority having jurisdiction

Permitting and review here

The City of Delray Beach, plus historic preservation review inside the Old School Square district. A restaurant here typically needs the building department, the fire marshal, the health authority and a preservation review — and the outdoor dining and sign package can carry a path of its own again.

What the ground and the structure do

Site and building conditions in Delray Beach

Old, small, tightly packed buildings with shared walls and shared alleys. Getting a kitchen exhaust duct to the roof, finding somewhere legal for a grease interceptor, and getting adequate electrical service into the space are the three questions that decide whether an Atlantic Avenue restaurant is buildable at the price being discussed.

Logistics

Access, loading and working hours

Alley loading where an alley exists and metered street loading where one does not. Atlantic Avenue is busy from lunch onward all year and heavily so in season, so demolition and heavy deliveries are strictly a morning activity.

The case

Why owners in Delray Beach call us

We build in buildings that are still open

Most commercial work here is not an empty shell. It is a floor above a working tenant, a suite next to a trading desk, or a dining room that has to serve on Friday. We phase, we work the hours the landlord allows, and we protect the path from the dock to your door.

A budget before you sign the lease

Send us the space and the landlord work letter before the LOI is final. We will price the build-out and name the assumptions, so you negotiate the tenant improvement allowance knowing the real number instead of finding it after you are committed.

Self-perform site engineering

Dewatering, support of excavation and deep foundations — including tidal sites — are done by our own crews, not brokered out. Very few Florida general contractors can say that. When a build-out turns into a structural or below-grade problem, it does not become somebody else’s schedule.

An institutional record behind the field team

Our leadership has delivered Hospital for Special Surgery’s FDR expansion, Emigrant Savings Bank fit-outs, the ADL tenant renovation in New York, and deep foundations at 1515 Surf Avenue. That is leadership experience, not a Romco Builders project list — and we will always say which is which.

FAQ

Questions from Delray Beach

Do you take commercial work in Delray Beach?
Yes. About 35 minutes from our Fort Lauderdale base. The City of Delray Beach, plus historic preservation review inside the Old School Square district. A restaurant here typically needs the building department, the fire marshal, the health authority and a preservation review — and the outdoor dining and sign package can carry a path of its own again.
What decides whether an Atlantic Avenue restaurant space is viable?
Three things, and all of them are answerable in week one: whether the kitchen exhaust can legally reach the roof, whether there is a workable location for a grease interceptor, and whether the incoming electrical service will carry your equipment schedule. If any answer is bad, that is a reason not to take the space.
How many approvals does a Delray restaurant need?
Typically the building department, the fire marshal, the health authority, and — inside the Old School Square district — preservation review. Outdoor dining and signage often add another. We map all of them before design finishes, because they do not run in a single queue.
Do you charge to look at a space and give us a number?
No. A walk-through and an order-of-magnitude budget on a Delray Beach space you are considering costs you nothing — that conversation should not have an invoice attached. A full preconstruction engagement, with a line-item budget, a constructability log and a permitting map, is a priced scope of work, and we credit the fee against the construction contract if you build with us.
Can you work around the hours our business actually operates?
Yes, and in Delray Beach it is usually the only way the job gets done. Phased construction, off-hours demolition, temporary partitions and a maintained path of egress are normal parts of our scope. Off-hours premiums are shown as their own line so you can see exactly what the phasing costs.

Next step

Building in Delray Beach.

Send a floor plan, a lease exhibit, or a landlord work letter. We come back with a real number and the assumptions behind it.