Compare
Hiring a GC vs. Managing the Subs Yourself
Contracting the trades directly removes the general contractor’s fee, and on a small, simple job that can be the right decision. What it does not remove is the work the general contractor was doing — it transfers that work, and the risk attached to it, to you.
Send a floor plan, a lease exhibit, or a landlord work letter. We come back with a real number and the assumptions behind it.
Side by side
| Category | Romco Commercial | Managing the Subs Yourself |
|---|---|---|
| Cost | A fee for coordination, risk and warranty | No fee — a genuine and immediate saving |
| Scope gaps | We review scopes against each other so the work between two trades is assigned | Gaps surface mid-job and become extras nobody agreed to |
| Schedule | One programme, sequenced, with trades held to it | Each trade schedules to its own convenience |
| Permit and inspections | We are the contractor of record and carry it | You coordinate submittals, comments and inspection scheduling yourself |
| If something fails | One party responsible for the finished work | Trades point at each other and you arbitrate |
| Insurance and liens | We carry the coverage and manage lien releases | You verify every certificate and every release yourself |
Our view
The honest verdict
Managing the subs yourself genuinely wins on cost, and it wins clearly. On a straightforward job — paint, flooring, some light electrical, no permit or a simple one — an owner with time and construction literacy will save real money, and hiring a general contractor for that work would be a waste of your fee. The calculation flips as soon as trades have to be sequenced against each other, a permit is involved, or the space is occupied. What you are buying from a general contractor is not labour. It is a single accountable party when the ceiling grid and the ductwork want the same six inches, and the answer has to be decided today.
Other comparisons
Design-Build vs. Design-Bid-Build
Design-bid-build finishes the drawings, then puts them out to competitive bid. Design-build brings the contractor in during design. Both are legitimate. They fail in different ways, and the right choice depends on how firm your scope already is.
Read more →
Us vs. the Landlord’s Preferred Contractor
Most South Florida landlords have a contractor they suggest, and some leases require one for specific scopes. That is not a scam — it exists for real reasons — but it is worth understanding whose interests the arrangement is built around.
Read more →
Local GC vs. a National Rollout Contractor
If you are a brand opening locations in several states, a national rollout firm is a reasonable answer. If your locations are in Florida, the calculation changes — because the thing that actually delays a build-out here is jurisdictional, and jurisdictions are local.
Read more →
A Licensed GC vs. an Unlicensed Crew
There is always a crew that will do it cheaper and start on Monday. On residential handyman work that is often fine. On permitted commercial work in a leased building, the exposure sits with you, not with them — and that is the part worth being clear about.
Read more →
Renovating vs. Renewing the Lease As-Is
The alternative most owners actually choose is to do nothing — renew the lease, keep the space as it is, and spend the money elsewhere. Sometimes that is exactly right. It is worth being honest about when it is not.
Read more →
Next step
Ready to price your project?
Send a floor plan, a lease exhibit, or a landlord work letter. We come back with a real number and the assumptions behind it.
